Long Term Control Plan Documents

The City of Omaha Final Long Term Control Plan was submitted to the Nebraska Department of Environment and Energy (NDEE) on September 25, 2009 and was approved in February 2010. The Long Term Control Plan was updated and approved by NDEE in January 2015. 

2014 Long Term Control Plan Update
2009 Long Term Control Plan

AdobePDF18px.png Executive Summary, October 2009 (861 KB)

AdobePDF18px.png Volume I, October 2009 (9.5 MB)

AdobePDF18px.png Volume II, October 2009 (53 MB)

AdobePDF18px.png NPDES Permit, October 2010 (321 KB)

AdobePDF18px.png Final Consent Order, August 2007 (2.5 MB)

AdobePDF18px.png Amended Consent Order, October 2019 (4 MB)

AdobePDF18px.png Presentation to Consultants, July 2009 (3 MB)

AdobePDF18px.png NDEE Approval Letter, February 2010 (80 KB)

CSO! Quarterly & Annual Reports
Awards

AdobePDF18px.png 2010 ACEC Honor Award, 2010 (165 KB)

Refinement Period (November 2007–October 2009)

Following submission of the Substantively Complete Long Term Control Plan, the City embarked on a two-year Refinement Period to confirm technical concepts, redefine the plan, confirm costs, and develop other aspects of the Long Term Control Plan. The Refinement Period culminated in the submission of the Final Long Term Control Plan. Twenty-five separate refinement tasks were carried out and are discussed in Section 3.4 of the Final Long Term Control Plan, Volume 1. Key documents from the Refinement Period are included below.

Green Infrastructure
Sustainability Guidance

AdobePDF18px.png Sustainability Guidance TM, August 2009 (220 KB)

Community Enhancements

AdobePDF18px.png Community Enhancements TM, April 2009 (3 MB)

Sewer Backup & Street Flooding Recommended Approach
Basin Study Refinements
Hybrid Alternatives

Basin Study Period (April 2006–October 2007)

During this period, basin plans were developed that identified recommended CSO solutions for each of the 10 Combined Sewer Overflow basins. Information contained in these Preliminary Basin Plans was compiled to develop cross-basin alternatives and to prepare the Substantively Complete Long Term Control Plan, which was submitted to NDEE in September 2007. The documents below were further evaluated during the Refinement Period. As such, information contained in the documents below has been superseded by information in the Refinement Period documents and the Final Long Term Control Plan.

Substantively Complete Long Term Control Plan
Public Meeting Presentations
Cross-Basin Alternatives

AdobePDF18px.png Cross-Basin Alternatives Summary TM, February 2008 (176 MB)

Preliminary Basin Plans