26th & Corby Sewer Separation Phase 1 Project


Schedule:

Currently under construction.

Project Description

Portions of the combined sewers in the area between Florence Boulevard, the North Freeway (Hwy 75), Lake Street, and Pinkney Street will be separated in this project. Separating selected sanitary and storm sewers in this area will reduce basement backups in neighborhood homes and overflows into the Missouri River.

The project engineering team held a public meeting in spring 2010 to introduce area residents to the project. The meeting was followed by mailings that provided additional project information and asked area residents to answer questions about sewers in the area. Additional meetings and mailings will keep residents informed as design and construction of the project continues.

Relocation of 8 inch Water Main
Relocation of 8 inch Water Main
Vitrified Clay Pipe Ready for Pilot-Tube Microtunneling
Vitrified Clay Pipe Ready for Pilot-Tube Microtunneling
 
 
 
 

Project References

Project Number: OPW 51778
LTCP Project Name: 26th & Corby Sewer Separation Phase 1

Additional Resources

Project Kick-Off Public Meeting

Preliminary Design Public Meeting