Cole Creek CSO 204 Area - Phase 3 Combined Sewer Separation (Taylor to Ruggles Between 56th & 61st)

The Cole Creek CSO 204 Area - Phase 3 Combined Sewer Separation Project is a multi-phase project located in a 522 acre basin referred to as Cole Creek 204.

It is bordered on the north by Brown Street, on the east by 52nd Street, on the south by Northwest Radial Highway, and on the west by Cole Creek.

The Phase 3 Project includes a new sanitary sewer in Taylor Street, Sahler Street, Sprague Street, North 56th Street, and Ruggles Street. The sanitary sewer will connect to a separated downstream sanitary sewer.

Project Benefits

This project is Phase 3 of approximately four planned phases of work planned within the Cole Creek 204 basin that will convert the existing combined sewers to separated sewers. It will ultimately result in reduced sewer backups into area homes and reductions in combined sewer overflow volume and flow rate in Cole Creek.

Additional Resources

Wistia video thumbnail
 
 
 
 
 
 

In lieu of a public meeting at this time due to COVID-19, we have prepared a short summary video that explains this project in much greater detail. Please do not hesitate to reach out to the team listed below with any questions you may have.


factsheet.png   Project Factsheet

Schedule

Construction is underway.


Contact Information

City of Omaha
Tim Papstein
402-444-3590

Design Consultant
George Butler and Associates
Kurt Hassler
402-513-3151

Public Facilitator
Emspace + Lovgren
Brian Kaminski
402-964-0213
brian@emspacegroup.com


Project References

Project Number: OPW 53206

LTCP Project Name: Cole Creek CSO 204 Phase 3