Omaha CSO

Skip to content

61st and Radial Storm Sewer

The 61st and Radial Storm Sewer Project provides sewer separation for a portion of the residential area located to the west of 61st Street between NW Radial Highway and Pratt Street.

The main goals of this project are to reduce CSOs and separate stormwater deriving from the separated portion of the Benson business district from the combined sewer that snakes through the residential area located to the west of 61st Street. This will significantly reduce the potential for basement backups and street flooding in the area.

Project Map

factsheet.png   Project Factsheet


schedule

Conceptual design is underway; 10% design documents are expected Q3 2023.


contact information

City of Omaha
Public Works Department
Project Manager: Max Kiemde
402-444-3390

Consultant
Benesch
Erica Mullen
402-333-5792


project references

Project Number: 54374

LCTP Project Name: 61st and Radial Storm Sewer