Papillion Creek North (PCN) CSO 210 Sewer Separation Project


Schedule

This project is being prepared for Request For Proposals (RFP). The RFP is anticipated to be issued in January 2018 for Consultant selection.

Project Description

The PCN 210 Sewer Separation project is located in the Papillion Creek North Basin. It is bordered on the north by Maple Street, on the east by 60th Street, on the south by Blondo Street, and on the west by North 66th Street.

An existing diversion structure is located at the intersection of North 66th Street and Blondo Street that will be modified or plugged as part of this project.

This project includes the construction of a combination of new sanitary sewer and new storm sewer to provide complete separation to the area. In 2002 a combined sewer renovation project (RNCL 5788A) was completed in the area of 61st and Lake Street.

Project Benefits

This project will convert the existing combined sewers to separated sewers. It will ultimately result in reduced sewer backups into area homes and reductions in combined sewer overflow volume and flow rate into Papillion Creek.

Project References

Project Number: OPW 53320

LTCP Project Name: PCN 210 Sewer Separation

Additional Resources

None at this time.